The Kentucky Transportation Cabinet has announced the start date for the first phase of the Highway 54 widening project. Beginning on Sunday, July 14, both eastbound lanes will be shifted to allow for the construction of…
County Clerk Migrating to New Vehicle Information System
The Kentucky Transportation Cabinet is modernizing the state's vehicle information database. A 40-year-old legacy system will be replaced in early January by KAVIS (Kentucky Automated Vehicle Information System). To allow for the transfer of records, motor…
Antler Alert: Drivers Should Watch for Deer
The Kentucky Transportation Cabinet is reminding drivers to watch for deer. About half of all car-deer collisions occur during the final three months of the year, with November having the most. Deer mating season is triggered…
Owensboro Outer Loop Feasibility Study
The Kentucky Transportation Cabinet and the Green River Area Development District are evaluating the feasibility of an ‘outer loop’ around Owensboro. “Right now, we are working on a study of the potential use or need for…
KYTC outlines repair work on secondary highways
The Kentucky Transportation Cabinet (KYTC) will resurface two rural secondary highways and repair a box culvert, if funds allow in the next fiscal year. KYTC Engineer Jason Ward outlined the three projects in a presentation to…
Install Daviess County Kentucky
Install this application on your home screen for quick and easy access when you’re on the go.
Just tap then “Add to Home Screen”